Pregledavate arhivu oglasa objavljenih na www.boljiposao.com.
Ovaj oglas je istekao 08.05.2016. i više nije aktivan.
Sadržaj oglasa prikazan je isključivo u informativne svrhe.
Trenutno aktivne oglase pogledajte na www.posao.hr.

National / International consultant for mid-term revision of integrated local development strategies of the municipalities

Oglas je istekao
Poslodavac:
Kategorija:
Mjesto rada:
BiH
Rok prijave:
08.05.2016.

O poslu

Opis radnog mjesta:
National / International consultant for mid-term revision of integrated local development strategies of the municipalities: Bosanska Krupa, Cazin, Bosanski Petrovac and Bužim (2 positions)


Location : BOSNIA AND HERZEGOVINA
Application Deadline : 08-May-16 (Midnight New York, USA)
Time left : 12d 10h 29m
Type of Contract : Individual Contract
Post Level : National Consultant
Languages Required : English
Duration of Initial Contract : May – September 2016 (maximum 40 work days per consultant)
Purpose of this Terms of Reference (TOR) is to provide technical support for the process of mid-term revision of the integrated local development strategies of the following municipalities: Bosanska Krupa, Cazin, Bosanski Petrovac and Bužim. Under this TOR, two (2) consultants (hereinafter referred to as the Consultant) will be engaged for the provision of technical support to local development teams of the above mentioned municipalities in the process of mid-term strategy revisions.
The process of mid-term revision is preceded by the process of mid-term evaluation of the four (4) above mentioned integrated local development strategies and is currently being conducted by independently hired consultants. The evaluation process is expected to be completed by end of April 2016 and the evaluation results will be made available to the Consultant engaged under this TOR as one of key inputs for initiation of the revision processes.
The local development strategies in the municipalities of Bosanska Krupa, Cazin, Bosanski Petrovac and Bužim were designed in accordance to the Methodology for Integrated Local Development Planning (MiPRO) for the period 2011-2020. The process of strategy development had been entirely led by the municipal/city development teams and supported by the Integrated Local Development Project (ILDP). The applied MiPRO methodology envisages revision of strategies five years into the implementation process and the purpose of this consultancy is to provide technical assistance, guidance and advice for the upcoming mid-term strategy revisions. As mentioned earlier, one of the main inputs for the revision processes will be results of the mid-term evaluations that will provide substantive insight into the level and quality of progress of the strategies’ implementation, as well as an overview of major changes to the local contexts and priorities. The evaluation will also provide overviews of the level and quality of institutional, organizational and other relevant capacities of the above mentioned local governments which are necessary for effective implementation of strategic plans and overall local development management.
The consultancy will take place under the ILDP, which is a joint initiative of the Government of Switzerland and UNDP, aimed at strengthening local development through introduction of a systematic approach to strategic planning, implementation, monitoring and evaluation of strategy realization including harmonization of the local level planning system with the higher levels of government. The project is implemented in partnership with the BiH Ministry of Human Rights and Refugees, the FBiH Ministry of Justice, the RS Ministry of Administration and Local Self-Government and both Associations of Municipalities and Cities (AMCs). As such, the ILDP is an integral part of the UNDP Local Governance Programme.
Objective
The main objective of the consultancy is to have local development strategies in the four (4) above mentioned municipalities revised and ready for adoption by the relevant municipal bodies, in accordance with the MiPRO and additional guidelines that will be provided to the Consultant by the ILDP prior to launch of the revision process.
The mid-term revisions will be led by the municipal development teams and will be conducted in a participatory manner including the wider local community at key points in the process. The revision process will consist of three main phases in accordance to the MiPRO guidelines:
First phase: Strategic Platform Revision Phase – during this phase, socio-economic analysis shall be reviewed and changes to the local context reflected. In accordance to the contextual changes, strategic platform shall be revised.
Second phase: Sectoral Planning Phase – during this phase, new 5-year sectoral plans shall be designed.
Third phase: Operational Planning Phase – during this phase, a 3-year (1+2) indicative implementation plan shall be designed.
The process itself, while led by the local development teams, shall be steered, facilitated, guided and quality assured by the hired Consultant through a series of workshops, on-job assistance and readily available expert advice.

Background Information
The municipalities of Bosanska Krupa, Cazin, Bosanski Petrovac and Bužim adopted their integrated development strategies in 2011, with technical support to the strategic planning process provided by the ILDP. Throughout the process, these local governments involved a significant number of community stakeholders, including representatives of public, private and civil sector.
The integrated development strategies define strategic goals and main strategic focuses for a long-term period of ten years, while their specific sectoral plans (social, economic and environmental) define sectoral objectives, outcomes, programs, projects and measures for the period of five years.
Alongside mid-term sectoral plans, the strategies include implementation plans (1+2 years), which, in addition to specifically outlined priorities for the first year, contain indicative projections of priority projects for the next two years, including timeframe, responsibilities, measurable results and financial resources. Preparation of implementation plans is closely linked with preparation of local governments budgets and serve as a mechanism for strategy implementation, whereas, priorities from implementation plans are incorporated into annual work plans of local governments’ individual departments. Therefore, implementation of strategies is carried out through line departments as well as external implementation actors and it is monitored, evaluated and reported, firstly at the municipal/city departmental level and the level of central development management units, and, at a later stage, through thematic meetings of local governments’ senior management.
In addition to technical support for strategy design and strategy operationalization processes, UNDP, through ILDP, has been working with partner local governments on strengthening their institutional and organizational capacities required for effective management of development activities.
Bearing in mind that the 5-year cycle of strategy implementation has come to an end and that the sectoral plans, which are an integral part of strategies, have expired, local governments of Bosanska Krupa, Cazin, Bosanski Petrovac and Bužim initiated preparatory activities for the strategy revision process. Initial activities are aimed at evaluation of the strategic documents’ achievements while findings and recommendations of the evaluation process will represent starting input for the revision of strategic documents, which is the main purpose of this ToR.

Key aspects of the revision process
Central to the overall MiPRO approach in terms of strategy development is inclusive planning characterised by transparent and fair conditions for citizen participation and social inclusion into the local planning process. This remains one of the main principles of the strategy revisions which in fact represents a renewed cycle of strategic planning. Local development teams in the four subject matter local governments had been previously engaged in the strategic planning processes which took place back in 2009/2010 and the ILDP will seek to revitalise the teams for the process of strategy revision. Having previously participated in the strategic planning process, the teams are expected to have the required know-how, skills and competencies to effectively lead the strategy revision with the technical assistance provided by the designated Consultant. Besides the local development teams, the process envisages participation of sectoral working groups which will take an active part in the Sectoral Planning Phase. The sectoral working groups consist of experts from public, private and non-governmental sector while partnership groups are another vital stakeholder of the process representing the citizen participation mechanism.

Key aspects of the process itself are as follows:

· The revision process will be carried out in accordance to the MiPRO and related ILDP guidelines and recommended approach to be distributed to the Consultant prior to the initiation of the revision process. The Consultant is required to ensure compliance of both the process and its outputs with these documents;

· The revision process will carefully consider and integrate key findings of the mid-term evaluation reports prepared prior to the strategy revision;

· The process will be organized in three phases as stated above, via series of workshops, specifically organized for the target groups, namely, development teams, sectoral working groups and partnership groups, as required. The workshops will be thoroughly prepared and facilitated by the Consultant;

· The process will be coordinated and led by the development teams throughout all the phases while the sectoral working groups are responsible for providing expert inputs during the sectoral planning phase;

· Partnership groups will be consulted at least twice during the process, at the end of the Strategic Platform Revision Phase and at the end of the Operational Planning Phase. The partnership group meetings will be prepared and led by the development teams with critical advice and guidance provided by the Consultant;

· Each phase will result in an output product as follows:

1. Output of the Strategic Platform Revision Phase: Revised Strategic Platform;

2. Output of the Sectoral Planning Phase: 5-year Sectoral Plans;

3. Output of the Operational Planning Phase: 3-year Implementation Plan.

The Consultant will be responsible for reviewing, re-drafting and harmonizing all of the expected outputs with both the MiPRO and related guidelines. Each phase output is required to be validated by local development teams and ILDP in order to be finalized.
The main strategy revision bodies shall be:



1. The Development Team (DT), which is the main body for the local strategic revision process and had been established during the process of strategic planning by the municipal/city mayors. It usually comprises between 7 – 15 members who are competent senior representatives from each relevant sector within the municipal administration. The team also include representatives of the local development agency, if existing; representatives of the private and civil sector, and possibly of the Municipal/City Council. As such, the DT will be responsible for coordination of the revision process and provision of key strategy inputs throughout all revision stages, as well as for inclusion, consultation and overall coordination of all relevant stakeholders.

2. The Sectoral Working Groups (in the social, economic and environmental sectors as demanded by the strategic planning process), each comprising approximately 10 – 15 representatives of relevant local government administration, socio-economic stakeholders, etc., established by the DT and responsible for key inputs to the Sectoral Planning Phase.

3. The Community Development Partnership Group, which is a broad consultative partnership, ensuring engagement and contribution by a wide scope of interested stakeholders not only in the strategic planning, but also in the follow-up strategy implementation process. It comprises representatives of socio-economic partners, citizen groups, private sector, media, etc. and as such is seen as a partnership mechanism between the local government and socio-economic stakeholders.

Duties and Responsibilities
For this consultancy assignment, two (2) consultants will be hired for the target cluster consisting of four municipalities (Bosanska Krupa, Cazin, Bosanski Petrovac and Bužim).
Hence, the consultancy will be conducted in a way that two consultants will be working jointly in the process of strategy revision in the 4 local governments which will require close cooperation and coordination by the consultants as they see it fit.
The maximum consultancy days under these ToR should not exceed 40 days per consultant for the entire cluster.
The consultancy will ensure required technical assistance to the process of strategy revision which consists of the following:
· TA1 = facilitation and coaching of the working groups, development teams’ workshops and meetings. Facilitation refers to moderation, animation, structuring of workshops with the goal of ensuring participants’ ideas, experiences, information, that would result in identifying convergent ideas, perspectives and widely promoting agreed consensus positions on various issues. Coaching refers to support, feedback, guidance and, as required, proposal of corrective measures to the members of the local planning bodies in the strategic planning process;

· TA2 = reviewing, correcting, drafting, re-drafting components of the revised local development strategies focused on assisting key members of the local planning bodies directly. TA2 is hands-on, highly directive and involves expert support for document drafting and formulation. This will include “desk work” (if involving correction or drafting) and follow-up discussions, explanations and advice provided to the municipal actors on how to take the process forward.

More concretely, the Consultant will be expected to perform the following tasks:

Task 1: Review of relevant documents (strategies, evaluation reports, MiPRO, related guidelines etc.) and development of a detailed work-plan
Under this task, the Consultant will collect all relevant documents and become well acquainted with the municipal integrated development strategies, mid-term evaluation reports, and related planning and reporting documents.
Also, as part of this task, the Consultant will become familiar with the MiPRO, its main principles and tools, the main stakeholders who took part in the process of strategic planning in the target municipalities as well as the strategic planning processes which took place in 2009/2010. Additionally, the Consultant will review the guidelines distributed by ILDP and related to the upcoming revision process and provide a critical reflection on the proposed approach, available formats and tools.
Following the documentation review, the Consultant will propose a detailed work-plan outlining the approach and timeline of the process in each municipality. The work plan will be submitted for approval by ILDP and the target municipalities. Following the approval, the Consultant will, in coordination with ILDP, schedule initial meetings with the target municipalities and inform the ILDP accordingly.
It is envisaged that this task will be delivered by end of May 2016 and the level of effort per Consultant will not exceed 4 work days for the intervention cluster.

Task 2: Provision of technical support to the process of revision
Under this task, the Consultant will provide technical assistance to the process of strategy revision. The technical assistance will include TA1 and TA2 assistance as described above. The Consultant is expected to steer, guide and facilitate the entire process which will result in a final draft revised strategy of the target municipalities.
Technical assistance will be delivered through a series of workshops carefully conceptualized, designed, and delivered by the Consultant in accordance to the ILDP Guidelines which will prescribe expected number of workshops in each of the three envisaged revision phases, as well as overall methodological approach, required formats and tools. The Consultant will facilitate and guide the revision process having in mind key aspects of the revision process as laid out above, ensuring timely delivery of all envisaged outputs during the three revision phases. As part of this task, the Consultant will collect signed participants list from all workshops and meetings held during the revision processes and forward them to the ILDP designated officer, together with the final draft outputs from the three phases.
It is envisaged that this task will be delivered by end of August, 2016 and the level of effort per Consultant will not exceed 26 work days for intervention Cluster.
Task 3: Finalization of draft revised strategies
The Consultant will finalize the draft revised strategies and ensure their alignment with the MiPRO and /ILDP Guidelines. The Consultant will thereafter submit the draft revised strategies, previously validated by the DTs, to ILDP for review and approval. It is envisaged that this task will be delivered by beginning of September 2016 while the level of effort per Consultant will not exceed 6 working days for the entire intervention cluster.

Task 4: Quality assurance of the final draft strategies
Under this task, the Consultant will ensure required level of quality of the process and that of the final draft outputs, namely, revised strategic platform, new 5-year sectoral plans, operational plan and the revised draft of strategy as a whole. The Consultant will conduct quality assurance in close cooperation with ILDP designated officer. Quality assurance includes the following:

· reviewing the draft documents and ensuring harmonization with the MiPRO and ILDP guidelines;

· redrafting segments of the documents that are not satisfactory providing brief argumentation of the introduced changes;

· validating the final draft output with the ILDP;

· following-up on additional requests for changes that may come as part of the validation process and coordinating finalization of the draft outputs with the DTs.

This applies to all three phase’s main outputs. The Consultant will in particular review and assure quality of the final draft revised strategy as a whole.
The minimum structure of the revised strategy is as follows:

· Introduction (including main findings of the evaluation report);

· Methodology;

· Revised strategic platform;

· Revised sectoral objectives and plans;

· Operational plan.

The required formats, tools and instructions in terms of maximum number of pages for each of the products shall be delivered to the Consultant as part of the ILDP guidelines to be provided at the beginning of the Consultant’s engagement. It is envisaged that this task will be delivered by mid of September, 2016 while the level of effort of the Consultant will not exceed 4 working days per intervention cluster.
All planned activities for the Task 1, Task 2 and Task 3, should be completed over the period from May-September 2016 with total number of days not exceeding 40 consultancy days/consultant for the entire intervention cluster.

NOTE: Consultants are expected to work together on all tasks and deliver the expected deliverables in a coherent and harmonized manner.

Deliverables and timelines
The consultant is responsible for the following deliverables:
Deliverables (outputs) Deadline
Task 1: Review of relevant documents (strategies, evaluation reports, MiPRO, related guidelines etc.) and development of a detailed work-plan

· Relevant strategy documents and evaluation reports reviewed;

· Work-plan for the revision process developed. End of May, 2016, (4 work days/Consultant)

Task 2: Provision of technical support to the process of revision

· All three phases of the revision process completed through a series of organized workshops held with the development teams and sectoral groups. End of August, 2016,(26 work days/Consultant)

Task 3: Finalization of draft revised strategies

· Draft revised strategies validated by DTs and submitted for ILDP’s review. Beginning of September, 2016,(6 work days/Consultant)

Task 4: Quality assurance of the final draft strategies

· Final draft of revised strategies quality assured, fully aligned with the MiPRO and ILDP methodological guidelines, and validated by both ILDP and DTs. Mid of September, 2016, (4 work days/Consultant)

Competencies
a. Corporate Responsibility and Teamwork:
· Demonstrates commitment to UNDP’s mission, vision and values;

· Displays cultural, gender, religion, race, nationality and age sensitivity and adaptability;

· Plans, prioritizes and delivers tasks on time;

· Strives for and promotes excellence in performance continually;

· Participates effectively in a team-based, information-sharing environment, collaborating and cooperating with others;

· Generates ideas and seizes opportunities to support corporate strategic objectives.

b. People Skills:

· Demonstrated ability to work harmoniously with persons of different national and cultural backgrounds;

· Recognizes and responds appropriately to the ideas, interests, and concerns of others;

· Builds trust and engenders morale by displaying open, transparent and credible behavior;

· Respects individual/cultural differences; utilizes diversity to foster teamwork;

· Ensures others’ understanding of, involvement in, and adaptation to a change process.

c. Partnering and Networking:

· Communicates sensitively and effectively across different constituencies;

· Ability to work as a member of a team as well as work autonomously.

d. Results-Orientation:

· Plans and ensures quality results to meet established goals.

e. Communication:

· Formulates written information clearly and persuasively;

· Shares information openly with co-workers and partners while using discretion to protect confidences;

· Presents information in a clear and articulate manner.

f. Job Knowledge and Expertise:

· Strong analytical skills;

· Advanced writing skills,

· Progressive knowledge of strategic planning at local and higher levels and the related methodologies;

· Strong facilitation and coordination skills;

· Substantive knowledge on security issues and activities with an emphasis on local communities;

· Executes day-to-day tasks systematically and efficiently;

· Initiative and sound judgment.

Required Skills and Experience
· University degree in public development studies, economics, political or social sciences or a related field;
· Minimum 5 years of progressive experience in local development, strategic planning and/or strategy implementation primarily at local/regional level, specifically in Bosnia and Herzegovina;

· Rich experience in analysis, definition and implementation of local development policies, strategies or programmes, particularly relevant for the local/regional level;

· Proven experience in facilitation and coaching of small groups of participants;

· Proven analytical skills and ability to conceptualise and write concisely and clearly in the languages of BiH peoples (Bosnian/Croatian/Serbian);

· Knowledge and previous experience at the local level within the particular cluster;

· Previous experience in applying MiPRO at local or higher levels in Bosnia and Herzegovina is considered an asset;

· Knowledge and previous experience at the local level within the particular LOT/cluster is considered an asset;

· Fluency in English and the official languages in BiH.

Individual consultants will be evaluated based on the following methodology:

1. Cumulative analysis

When using this weighted scoring method, the award of the contract should be made to the individual consultant whose offer has been evaluated and determined as:
a) responsive/compliant/acceptable, and
b) Having received the highest score out of a pre-determined set of weighted technical and financial criteria specific to the solicitation.

· Technical Criteria weight-70%

· Financial Criteria weight- 30%

Only candidates obtaining a minimum of 50 point would be considered for the Financial Evaluation
Criteria Weight Max. Point
Technical

· Minimum 5 years of progressive experience in local development, strategic planning and/or strategy implementation primarily at local/regional level, including socio-economic analysis, specifically in Bosnia and Herzegovina; 20% 21;

· Proven analytical skills and ability to conceptualise and write concisely and clearly in the languages of BiH peoples (Bosnian/Croatian/Serbian); 20% 18;

· Knowledge and previous experience at the local level within the particular cluster. 20% ;

· Previous experience in applying MiPRO at local or higher levels in Bosnia and Herzegovina is considered an asset 10% 10;

· Financial 30 % 30

UNDP is committed to achieving workforce diversity in terms of gender, nationality and culture. Individuals from minority groups, indigenous groups and persons with disabilities are equally encouraged to apply. All applications will be treated with the strictest confidence.
REFER A FRIEND APPLY NOW
If you are experiencing difficulties with online job applications, please contact [email protected].

Link: http://jobs.undp.org/cj_view_job.cfm?cur_job_id=65951

Vrsta posla:
rad na određeno vrijeme

O zaposleniku

Minimalna stručna sprema:
Fakultet
Strani jezik:
engleski
Poznavanje rada na računaru:
dobro
Potrebno radno iskustvo:
pet godina